This project was an $11.2 million dollar T.I., with a third of the contract consisting of HVAC/mechanical work. It involved a complete interior demolition and build-out of a two-story, 67,000 square foot office building in the Canyon Creek area of Bothell. The T.I. included the build-out of both lab and office space. The scope of work included upgrading utilities, adding new structural steel, installing new single-ply roof and all new rooftop HVAC units. About 20,000 square feet of the 1st floor slab was treated with a moisture stopping product (Aquafin) to prevent water from getting through the slab from the ground below before any vinyl flooring products could be installed. Lab space work included installing casework with epoxy countertops, fume hoods, and bio-safety cabinets. A “floating steel” stair system with stainless steel cables, an elevator, and storefront system were added to the entry lobby. Sonus Pharmaceuticals, the flagship tenant, moved into the space December 14th 2007.

Project Details

Location:


Bothell, WA

Owner:


BMR 217th Place, LLC

Architect:


SAB Architects

Project Size:


67,000

Completed:


2007

Category:


Renovation, Tenant Improvement