Northwest Logistics Center, Building 2
        
          Project Description
          Sierra broke ground in the fall of 2018 on a speculative 628,640 square foot distribution building. This is the second building in the Northwest Logistics Center which is located in DuPont, WA. ‘Building 2’ sits on a 32-acre site adjacent to Building 1, which was completed in 2014. Building 2 has 107 overhead doors and a 36’ clear height.
This project utilizes tilt-up construction, which was completed in two phases. In total, Building 2 has 148 tilt panels and used 21,660 cubic yards of concrete for its construction. This project was completed in under a year, wrapping up in September 2019.
        
        
  Share
  
  
      
Project Description
Sierra broke ground in the fall of 2018 on a speculative 628,640 square foot distribution building. This is the second building in the Northwest Logistics Center which is located in DuPont, WA. ‘Building 2’ sits on a 32-acre site adjacent to Building 1, which was completed in 2014. Building 2 has 107 overhead doors and a 36’ clear height.
This project utilizes tilt-up construction, which was completed in two phases. In total, Building 2 has 148 tilt panels and used 21,660 cubic yards of concrete for its construction. This project was completed in under a year, wrapping up in September 2019.
Share
Project Details
Location
DuPont, WA
  Owner
NW Logistics Industrial Holdings
  Architect
NELSON
  Size
628,640
  Completed
2019