Located on the southwestern edge of Everett near the Mukilteo city line, project teams at Bridge Point Everett 500 (also known as Bridge Point Soundview) began sitework on the 40 acre lot overlooking the Puget Sound.  The sloped site requires extensive sitework, including stormwater storage vaults, retaining walls, rockeries and cut/fill to prepare the site for the construction of three industrial buildings totaling over 485,600 square feet. 

Building I: 278,506 square feet, 34' clear height, 54 docks, 130' truck courts and 387 parking stalls
Building II: 85,719 square feet, 32' clear height, 25 docks, 180' truck courts and 90 parking stalls
Building III: 278,506 square feet, 32' clear height, 32 docks, 180' truck courts and 104 parking stalls

This project is due for completion in 2023. 


Sierra Construction Team:

Kirk MacGowan, Senior Project Manager
Matt Frause, Project Manager
Diane Yoo, Project Engineer
Katelyn McNeely, Project Administrator
Wayde Turner, Superintendent

Project Team:

Developer: Bridge Industrial
Architect: SynThesis
Civil Engineer: Navix 
Structural Engineer: Shutler
General Contractor: Sierra Construction

Project Details

Location

Everett, WA

Owner

Bridge Industrial

Architect

SynThesis

Size

485,683