Amazon Troutdale (previously known as Project Piper) is a 857,470 square foot distribution center on a 74 acre site in the Reynolds Industrial Park of Troutdale...
IPT Tualatin has been completed. This project included the new construction of a 157,230 square foot speculative manufacturing building on a 9 acre site along...
Glacier Peak at Riverside Business Park tilted last week. The entire project includes 112 panels with 4 sheer panels. The completed building will be a 204,498...
First Glacier Logistics building was tilted last week in Sumner, WA. Work began on First Glacier Logistics in October 2018. Built with a total of 55 tilt pan...
Work began on this site Fall of 2018. This new distribution facility will be a total of 66,000 square feet, with a 30’ clear height. First Glacier will also fea...
Previously known as ‘Bothell 185,’ the Edition Apartments is a 135 unit apartment building located on the corner of 185th and 102nd in Bothell, WA. Site clea...
Phase IV of the Des Moines Creek Business Park is situated on Pacific Highway, and included the construction of two new industrial buildings. Previously occupi...
Portside 55 North in Tacoma recently tilted the second building. This phase of the Portside 55 development consists of two buildings; Building A and Building B....
Ballard’s West Woodland Business Center is taking shape. The project team has completed concrete pours on each floor and has begun framing on the 4th floor. In...
Interbay is a four story self-storage in the Interbay district of Seattle. The 94,000 square foot building was constructed using a hybrid method that utilized b...