
Sierra Construction recently completed River's Edge, a new 166-unit apartment community in Monroe, Washington. Floorplans include 1,2, and 3-bedroom units, desi...

Bridge Point Auburn 200 is a 203,127 square foot speculative concrete tilt-up distribution center. The 11.47 acre site was previously owned by Supervalu and ha...

Sierra Construction and Ness Campbell have completed the tilt for Tacoma Gateway II in Parkland, Washington. The 100-panel tilt (91 wall panels and 9 ramp pane...

Prologis PDX 23 has received LEED Gold Certification. Completed this summer, PDX 23 is a 154,243 square foot distribution center located in the Columbia Corrid...

Currently under construction, Eclipse Fremont is a five-story wood-framed apartment building with 153 residential units. Located at 909 N. 39th St. on the corn...

Big River Logistics is a 192,000 square foot speculative distribution center located on a 10 acre site in Vancouver, Washington. The completed project has a 32’...

Kristine started her career at Sierra in 2005. She knew from a young age that should would end up in construction. “I started drawing floor plans in kindergarte...

Scott is a Superintendent here at Sierra. He came to Sierra in 1995 as a Carpenter, and has since worked his way to Superintendent. Over the years he has worked...

This 118,515 square foot concrete tilt-up distribution center was a build-to-suit project that broke ground January 2020. The 36’ clear height building has...

Portland Portal, Phase II took home First Place in the Industrial and Manufacturing category of DJC Oregon’s 2020 TopProjects. Portland Portal, Phase II is a m...