Skip to main content

Project Completion: Tradesmen Electric

PC Tradesman

This project resulted in a new office, warehouse and storage space for Tradesmen Electric company in Battle Ground, Washington. Scope of work included a tilt-up concrete structure with 6,000 square feet of office space and 20,000 square feet of warehouse space, as well as a secured parking lot with 20’ wide swinging gate, 47 paved parking spaces and a gravel outdoor storage yard. The warehouse is divided into two sections; one as a repair/maintenance shop for equipment and vehicles and the other features a storage mezzanine and multi-use storage space. A total of 9 sectional overhead doors provide multiple access points within the warehouse space. Finishing touches include a glass canopy entryway with steel post and tapered concrete columns, aluminum storefront panels and a two-story open-concept lobby.

On the Subject

Project Completion: LogistiCenter I5
Project Updates
Project Completion: LogistiCenter I5

Sierra completed Dermody Properties’ LogistiCenter I5 late this summer. Built on a 13 acre site in Lakewood, Washington, the 210,700 square foot concrete tilt-u...

Continue Reading