Skip to main content
Edit Page - Admin Only Control Panel - Admin Only

New Project: Bridge Point Everett 500

Soundview-Rendering

Located on the southwestern edge of Everett near the Mukilteo city line, project teams at Bridge Point Everett 500 (also known as Bridge Point Soundview) began sitework on the 40 acre site overlooking the Puget Sound. The sloped site requires extensive sitework, including stormwater storage vaults, retaining walls, rockeries and cut/fill to prepare the site for the construction of three industrial buildings totaling over 485,600 square feet.

Building I: 278,506 square feet, 34' clear height, 54 docks, 130' truck courts and 387 parking stalls
Building II: 85,719 square feet, 32' clear height, 25 docks, 180' truck courts and 90 parking stalls
Building III: 278,506 square feet, 32' clear height, 32 docks, 180' truck courts and 104 parking stalls

This project is due for completion in 2023.


Sierra Construction Team:

Kirk MacGowan, Senior Project Manager
Matt Frause, Project Manager
Diane Yoo, Project Engineer
Katelyn McNeely, Project Administrator
Wayde Turner, Superintendent

Project Team:

Developer: Bridge Industrial
Architect: SynThesis
Civil Engineer: Navix
Structural Engineer: Shutler
General Contractor: Sierra Construction

_S8A1482a Skytech - web

On the Subject

Project Update: Bridge Point I-5, Seattle
Project Updates
Project Update: Bridge Point I-5, Seattle

December was an exceptionally busy month at Bridge Point I-5 in Milton, WA. The first building to be constructed on the development's 117 acre site, Building 1...

Continue Reading