SUBCONTRACTORS 2018-09-06T08:05:30+00:00

SUBCONTRACTORS

We are proud to have long-lasting relationships with our subcontractors. By working together with some of the best here in the Pacific Northwest, we create a supurb final product that leads to our mutual success; without their support, our projects would not be possible.

Jobs currently open for bid are listed below. In order to do business with our company, we require subcontractors to prequalify annually in order to be eligible to bid or contract work with Sierra Construction. In addition to completing the Subcontractor Vendor Setup Form, we also require a copy of the business license, W-9 form, Reseller permit, and if applicable, a certification document.

Current Bid Opportunities

Tilt 348, Federal Way, WA
Bid Date: Tuesday, July 31st, 3:00pm Pacific Time

This project includes construction and build-out of a new 78,845-SF concrete tilt-up building & 6,600 total SF of office space on two floors. Project scope will include all earthwork and all site utilities, asphalt paving, landscaping, CIP concrete, structural steel, hybrid wood/steel roof structure, skylights, sheet metal flashing, pre-engineered dock canopies, joint sealants, roofing, painting, utility room build-outs, office build-outs, storefront, overhead doors, dock bumpers, and design-build MEP.

Please Note: TI drawings are estimated to be released 7/20/18. Also, please respond to corresponding alternate options as described in the outline specifications.



First Industrial, Glacier Building, Sumner, WA
Bid Date: Monday, July 9th, 2018 3:00pm Pacific Time

This project includes construction of a new 66,751-SF concrete tilt-up shell building. Project scope will include all earthwork and all site utilities, asphalt paving, landscaping, CIP concrete, structural steel, hybrid wood/steel roof structure, skylights, sheet metal flashing, pre-engineered dock canopies, joint sealants, roofing, painting, utility room build-outs, storefront, overhead doors, dock bumpers, and design-build MEP.



DCT Blair Logistics Center, Building B (Phase 2), Tacoma, WA
Bid Date: Monday, June 25th, 2018 3:00pm Pacific Time

This project includes construction of a new 416,492-SF concrete tilt-up shell building. Site rough grading including pad prep with surcharge removal will be completed by others by July 6, 2018. Project scope will include all remaining earthwork and all site utilities. Other scopes include asphalt paving, landscaping, CIP concrete, structural steel, hybrid wood/steel roof structure, skylights, sheet metal flashing, pre-engineered dock canopies, joint sealants, roofing, painting,
utility room build-outs, storefront, overhead doors, dock bumpers, and design-build MEP. Anticipated Start Date: July 15, 2018. Please see RFP and Outline Specs in Bid Documents for additional details/direction.



Forms

Want to keep up on what’s happening at Sierra? Subscribe to our News Blog

Enter your email address to subscribe to this blog and receive notifications of new posts by email.