Trader Joes
Project Description
This 500,000 square foot building was a complete turn-key, design-build project where Sierra Construction had responsibility for all design, permitting, construction and contingency risk of the concrete tilt-up distribution center. Built specifically for Trader Joes, the Hawks Prairie Building K project would provide distribution to the PNW.
The building features an 130,000 square foot ammonia cooled refrigerated area, 90,000 square foot 65 degree conditioned dry goods area, along with a considerable area of ambient storage and over 100 dock positions. Project build-out included a 20,000 square foot office, 10,000 square foot refrigerated RTE salad processing area, shipping and receiving offices, ancillary offices and refrigeration equipment room.
The time-frame from fill and grade permit in September 2011 to dry-in in January 2012 was a swift 128 days. The project was successfully completed in the summer of 2012.
Share
Project Description
This 500,000 square foot building was a complete turn-key, design-build project where Sierra Construction had responsibility for all design, permitting, construction and contingency risk of the concrete tilt-up distribution center. Built specifically for Trader Joes, the Hawks Prairie Building K project would provide distribution to the PNW.
The building features an 130,000 square foot ammonia cooled refrigerated area, 90,000 square foot 65 degree conditioned dry goods area, along with a considerable area of ambient storage and over 100 dock positions. Project build-out included a 20,000 square foot office, 10,000 square foot refrigerated RTE salad processing area, shipping and receiving offices, ancillary offices and refrigeration equipment room.
The time-frame from fill and grade permit in September 2011 to dry-in in January 2012 was a swift 128 days. The project was successfully completed in the summer of 2012.