Titus Will Ford & Toyota
Project Description
Sierra Construction completed two expansions and remodels for the Titus-Will automotive family.
In 2010, Sierra completed the new Titus-Will Toyota dealership in Tacoma. The project involved the construction of a new 53,000 square foot dealership to replace an existing new car sales building. The new facility includes showrooms for both Toyota and Scion, a 3-lane service drive up, a 3 bay quick-lube pit, a 25-bay service facility with in-ground lifts, a 9,000 square foot parts storage area on two floors, administrative and dealer office and conference/training areas.
We were brought on board early to participate in the design process to help direct project focus and to control construction costs. The complex building was constructed in 8 months from start of construction to owner move-in. The building is a structural steel frame with aluminum-composite metal panel and tilt-up concrete skin. It was designed and constructed in accordance with Toyota and Gensler’s (Toyota’s corporate architect) requirements to ensure compliance with Toyota’s Image 2012 program, whereby dealers are to update their buildings to meet corporate aesthetic and functional requirements.
It was initially assumed that the existing Titus-Will new car building would need to be demolished to allow for construction. However, we worked with the civil engineer to produce an overlay drawing of the new and existing structures, and were able to develop a partial demolition plan which allowed the existing building to remain operational during construction. This was a major benefit to Titus-Will, with literally no downtime at all during construction. Sierra and the design-build MEP subcontractors worked together with Helix Architects, the structural and civil engineers and the Toyota personnel to coordinate all design detail and facets of construction to ensure timely delivery of the project.
In 2014, Sierra began work on the Titus-Will Ford location in Tacoma, which required multiple phases to keep the dealership open during construction. Work included the demo of each structure and rebuild, which required extra care to ensure the attached structures that would remain were not damaged. The project included a remodel of the administrative suite as well as the demo and rebuild of the quick-lane service and business center, showroom, new car delivery bay, and construction of a new 8,000 square foot truck service shop building. Work also included new parking lot modifications and LED site lighting. Total duration including all phases of the project was 18 months.
Share
Project Description
Sierra Construction completed two expansions and remodels for the Titus-Will automotive family.
In 2010, Sierra completed the new Titus-Will Toyota dealership in Tacoma. The project involved the construction of a new 53,000 square foot dealership to replace an existing new car sales building. The new facility includes showrooms for both Toyota and Scion, a 3-lane service drive up, a 3 bay quick-lube pit, a 25-bay service facility with in-ground lifts, a 9,000 square foot parts storage area on two floors, administrative and dealer office and conference/training areas.
We were brought on board early to participate in the design process to help direct project focus and to control construction costs. The complex building was constructed in 8 months from start of construction to owner move-in. The building is a structural steel frame with aluminum-composite metal panel and tilt-up concrete skin. It was designed and constructed in accordance with Toyota and Gensler’s (Toyota’s corporate architect) requirements to ensure compliance with Toyota’s Image 2012 program, whereby dealers are to update their buildings to meet corporate aesthetic and functional requirements.
It was initially assumed that the existing Titus-Will new car building would need to be demolished to allow for construction. However, we worked with the civil engineer to produce an overlay drawing of the new and existing structures, and were able to develop a partial demolition plan which allowed the existing building to remain operational during construction. This was a major benefit to Titus-Will, with literally no downtime at all during construction. Sierra and the design-build MEP subcontractors worked together with Helix Architects, the structural and civil engineers and the Toyota personnel to coordinate all design detail and facets of construction to ensure timely delivery of the project.
In 2014, Sierra began work on the Titus-Will Ford location in Tacoma, which required multiple phases to keep the dealership open during construction. Work included the demo of each structure and rebuild, which required extra care to ensure the attached structures that would remain were not damaged. The project included a remodel of the administrative suite as well as the demo and rebuild of the quick-lane service and business center, showroom, new car delivery bay, and construction of a new 8,000 square foot truck service shop building. Work also included new parking lot modifications and LED site lighting. Total duration including all phases of the project was 18 months.