Project Update: Portside 55
Danyelle2018-09-18T07:28:10-07:00Portside 55 North in Tacoma recently tilted the second building. This phase of the Portside 55 development consists of two buildings; Building A and Building B. Building A is a 155,000 square foot building designed for future rail access. The building was tilted using 82 wall panels and 11 ramp panels, the heaviest weighting 113,300lbs. The smaller of the two, Building B, was constructed using 48 building panels and 8 ramp panels, the heaviest weighing 87,200lbs. The North phase of [...]