Project Description

Breaking ground in April 2015, this 333,180 square foot spec concrete-tilt up Class A industrial warehouse is the first phase of a 2.4 million square foot industrial development planned for Sumner, Washington. Built on a 24 acre lot, sitework involved the removal of 85,000 cubic yards of surcharge material, which was done in two weeks. Using our in-house concrete team, we had nine consecutive days of slab-on-grade concrete pours. With 128 tilt panels and a 32’ clear height, this project has 109 dock doors with 191 car and 20 trailer parking stalls. A tenant build-out is planned for Q1 2016.