Northwest Logistics

  • Northwest Logistics
Northwest Logistics 2016-01-28T19:04:32+00:00

Project Description

The 225,000 square foot concrete tilt-up distribution center, built on a 13 acre site was completed July 2015. The project used a hybrid roofing system with wood deck and metal joists, and implements a ESFR diesel fire pump. With clear heights of 36’, this project was designed to appeal to a large group of potential tenants. Exterior accents include red metal banding that wraps the building and entryways. A form liner was also used to create accented areas and visual continuity between and above windows. Additionally, the entire parking lot was paved with concrete instead of asphalt for a longer lifespan.

Project Details

Location:


DuPont, WA

Owner:


Islero, LLC

Architect:


Craft Architects

Project Size:


225,000

Completed:


2015

Category:


New Construction