NEWS

25Apr 2016

Sierra tilts first of three buildings in Koch Corporate Center

Walls were tilted for the first of three buildings at the Koch Corporate Center located in Tualatin, Oregon this past week.

The corporate center is designed for tenants with distribution or warehouse needs and includes build-to-suit office space. With the tilt-up completed April 21st, Building 1 totals 201,300 square feet with 32’ clear height and is the largest building in the Park.

The remaining two buildings, Building 5 (60,000 square feet) and Building 8 (46,875 square feet) will be tilted in May.

The Read More >

21Apr 2016

Project Completion: Sumner West Distribution Center

Avenue 55 has completed the development of a 6.62 acre Sumner West site located in Sumner, WA. The building is a concrete tilt-up, state-of-the-art distribution facility totaling 117,870 square feet.

The building features a clear height of 30’, 27 dock high doors, 2 grade level drive-in doors, 70 parking stalls, a hybrid roof structure, concrete truck aprons, and two office nodes with steel canopies over entryways.

Innova Architects was the project’s Architect, Civil and Structural Engineer.

Sierra Construction was the General Contractor with Read More >

15Apr 2016

Project Completion: Redmond Ridge 116 & 117

Recently completed, this Redmond Ridge project included the construction of two concrete tilt-up buildings, Building 116 (45,015 square feet) and Building 117 (40,625 square feet). The floor plan is set up to allow for up to four tenants per building. Building 116 has a sawtooth footprint which maximizes the use of the site while creating architectural interest. The project also included weather-protected areas under a soffit in lieu of external canopies for customers. Both buildings share a central loading dock allowing storefronts to face Read More >

10Mar 2016

2015 Company Bulletin is Now Available

View and Download Sierra Construction’s 2015 Company Bulletin

2Mar 2016

Helly Hansen takes half of Sumner warehouse

Tarragon says outdoor gear maker Helly Hansen will take more than half of its recently built 333,180-square-foot warehouse at SeaPort Logistics Center, 14218 Eighth St. E. in Sumner.

The tilt-up warehouse was built by Sierra Construction Co., with Innova Architecture as the designer and AHBL as the civil engineer.

Known as Building A, the warehouse is the first phase of the 2.4 million-square-foot industrial park. It has 109 dock doors and eight at-grade doors, a 32-foot clear height, ESFR sprinkler system, dock Read More >

24Feb 2016

Kent Valley Aerial: Sierra’s Projects

Sierra has had a few projects in the Kent Valley area in the past 10 years – well, over 3.2 million square feet worth! Thank you Skytech Aerial Photo for sharing

23Nov 2015

New Tacoma living: The Henry

The Henry, a brand new 161 unit mixed use project in the heart of Downtown Tacoma, hosted a grand opening event last Thursday with guided tours to the public and remarks by Mayor Marilyn Strickland. Developed by The Henry Group, the project not only has numerous resident amenities but also public waterfront patio space, esplanade and ground level retail opportunities.

The newest project on Thea Foss Waterway, The Henry offers amenities not typically found in Tacoma living. Pet friendly Read More >

19Nov 2015

Sierra completes tilt-up at Des Moines Creek Business Park

Sierra Construction recently completed the final concrete tilt-up in Phase 1 of Des Moines Creek Business Park.

Composed of three buildings with 30’ clear height ceilings, 165’-255’ bay depths, 119 dock height and 16 ground level loading bays, Phase 1 totals 535,958 square feet.

The first of three phases, the completed project is planned to total 1.6 million square feet of office, industrial and retail space on the 87 acre site. The Business Park’s location allows for access via multiple forms of Read More >

9Nov 2015

Sno-Isle Tech students tour Sierra construction site

Sno-Isle Tech (http://snoisletech.com/)
Course: Construction Trades
Instructor: Jerry Helm

Sno-Isle Tech instructor Jerry Helm brought 25 students of the school’s Construction Trades program for a site visit to the 22 West Mercer project on November 5. Sierra’s Project Superintendent Jon Gebow, a former student of Sno-Isle, led the students through the site office and jobsite.

Mr. Gebow introduced the students to the project with a brief showing of the construction documents, looking over architectural elevations and floor plans. The group then walked the site, Read More >

7Nov 2015

Stryker Business Center Wins Industrial Development of the Year

Stryker Business Center came home with the 2015 NAIOP Industrial Development of the Year award from the Night of the Stars.

A partnership of IDS Real Estate Group and Clarion Partners, the a three-building, 1.25 million-square-foot distribution park is located in Kent. Amazon leased two buildings totaling more than 1.1 million square feet for a distribution center, and is Amazon’s BFI4 and BFI5. Brighton Best International leased the third building, which has 125,000 square feet.

Load More Posts