Best Sewing Machines For Starters

NEWS

4Oct 2016

New Project: Linden Flats

GMD plans 170 affordable units for site on Linden, near Aurora
By BRIAN MILLER

GMD Development and architect BCRA have gone through the second design review meeting for Linden Flats, a six-story complex with 170 affordable units at 13280 Linden Ave. N.

Linden Flats will be “100 percent affordable,” said GMD’s Rebecca Ralston. Rents will be at or below 60 percent of area median income. The project team plans to use the city’s multifamily tax exemption (MFTE) program and low-income bonds from the Read More >

30Sep 2016

New Project: Stadium Apartments

Breaking ground in August 2016, the 220,000 square foot mixed-use Stadium Apartment building will be located in the Stadium District of Tacoma.

The project will have 172 residences varying from studio, one and two bedroom units. The project will also have 2,260 square feet of retail space and offer 204 parking spaces.

This project is due for completion by August 2018.

6Sep 2016

Project Completion: Uptown 11

Completed in August, this Queen Anne mixed use project is a three story, 42,700 square foot building with ground retail and upper floor residential units. The two and a half level underground parking garage has 65 parking stalls.

The 34 residential units range from studio to two bedroom spaces, span the top two floors, and some offer a private balcony. Units feature bamboo vinyl flooring, quartz countertops, stainless appliances and 9′ ceilings.  Uptown 11 also has a 9,500 square foot green roof with Read More >

15Aug 2016

Nation’s largest used car dealer starts work

LYNNWOOD — Construction is under way on a CarMax dealership along Highway 99.

The publicly traded company bills itself as the nation’s largest used auto dealership. It’s big enough to rank on the Fortune 500 list of wealthiest U.S. companies.

Work started last month on the 9-acre site of the former Detroit Autoworks property along Highway 99 at 212th Street SW. The project is expected to be finished in March.

Sierra Construction of Woodinville is the general contactor.

Plans call for a 19,277-square-foot, single-story Read More >

10Aug 2016

Highline Place – Phase 1 Groundbreaking

Monday held the ceremonial groundbreaking for Highline Place – Phase 1 in Des Moines, Washington.

The finished project will feature 160-bed, state of the art student housing  units for Highline College, and over 12,000 square feet of ground floor retail space. Each unit will have kitchens and living areas, and residents will have access to a large rooftop community room and deck. Looking towards the future, the location will also provide easy access to the future light rail system.

Highline College is in Read More >

29Jul 2016

Tilt completed at DCT White River Corporate Center

The final panel was tilted this morning for Building 2 at DCT White River Corporate Center in Sumner. Due for completion fall of this year, the 251,000 square foot distribution center is owned by DCT Industrial. 

29Jul 2016

Project Completion: Dwell at Kent Station

The City of Kent and Puget Sound-based developer Tarragon celebrated the completion of the Kent Station mixed-use, transit oriented development (TOD) last Thursday.

 

The final phase of the project included the construction of Dwell at Kent Station, a 154-unit, four story plus ground level parking apartment building. Units include a mix of studio, one bedroom, and two bedroom units, some including dens.

As a Built Green project, Dwell at Kent Station offers a long list of amenities. Residents have Read More >

8Jul 2016

Walls go up at DiJulio Land

Walls were tilted yesterday at the DiJulio Land Co. property in Everett. Due for completion this Fall, the project will be a 50,196 square foot warehouse for Lincoln Moving and Storage.

6Jul 2016

Hopworks to Open New Brewpub in Vancouver

Because beer lovers, biker riders, and families live in Vancouver, Washington, too, the brewpub chain popular with all three demographics (especially beer-drinking, bicycling parents), Hopworks Urban Brewery is opening a location in the suburb over the state line. Brewmaster Christian Ettinger opened the original pub and brewery on SE Powell in 2007. This will be the company’s third location after it opened Bike Bar—more of a tied house than a brewpub—on N Williams in 2011. As we first reported in Read More >

24Jun 2016

Final Phases of Des Moines Business Park Underway

 

Phase 3 of Panattoni Development’s Des Moines Creek Business Park is well underway.

Phase 3 includes the construction of two concrete tilt-up warehouse buildings totaling 502,194 square feet. Sierra Construction is the general contractor, and the project is due for completion Spring 2017.

Phase 2’s 299,000 square foot, five story office building will be home to the Federal Aviation Administration’s new offices and is slated to open in 2018.

Being developed by Panattoni and owned by the Port of Seattle, the Business Park Read More >

Load More Posts