NEWS

3 Mar 2017

New Project: Big Eddy Commerce Center

2017-03-03T11:05:31+00:00

Sitework began last year on this 135,387 square foot tilt-up commerce center on 7.5 acres in Gresham, Oregon.  'Big Eddy' will have a 30' clear height, 30 dock doors and 5 grade level doors with a 6" slab. The office will be build-to-suit. Located within in the Airport Way submarket the project is a part of a 230-acre master-planned business park development.

New Project: Big Eddy Commerce Center 2017-03-03T11:05:31+00:00
2 Mar 2017

New Project: Bothell 185 Apartments

2018-05-20T14:09:36+00:00

Puget Sound based real estate developer, Tarragon, broke ground this month on a 135-unit residential project in Bothell, WA. The six level apartment building will include five wood-framed stories of residential apartments over one story of secured parking, which includes 137 parking stalls. The unit mix will include a variety of unit types.Unit finishes and amenities will be modern with solid-surface counters, stainless steel appliances, hard-surface floors, and open layouts with an abundance of natural light. Some units will have [...]

New Project: Bothell 185 Apartments 2018-05-20T14:09:36+00:00
27 Feb 2017

Project Completion: WRCC Chinook

2018-05-20T14:09:36+00:00

Sierra received final Certification of Occupation this month for the DCT's White River Corporate Center Phase II North, also known as the 'Chinook' building. The 251,437 square foot Chinook has a 32’ clear height and offers 200’ truck courts with a 60’ concrete truck apron. A 7” warehouse slab and an average column spacing of 52’ x 50’ and 52’ x 60’ creates a wide range of tenant possibilities. Upon completion of the building shell, a 3,055 square foot speculative office build-out was [...]

Project Completion: WRCC Chinook 2018-05-20T14:09:36+00:00
20 Jan 2017

Tower Crane Raised at Linden Flats

2018-05-20T14:09:36+00:00

Thursday was a busy day for the Linden Flats jobsite in Seattle, and the weather provided a clear day for passer-bys to watch the action. Team members installed privacy screen along Linden Avenue and at the site corner near Wells Fargo, adorned with renderings of the final project as well as logos of the project team. Coast Crane installed a Potain crane that will aid in constructing the six story, multi-family building by supplying materials to various floors as the [...]

Tower Crane Raised at Linden Flats 2018-05-20T14:09:36+00:00
12 Jan 2017

Project Completion: Parkside Shops

2018-05-20T14:09:36+00:00

Located in the heart of PacTrust’s Columbia Tech Center development in Vancouver Washington, recently completed Parkside Shops is a unique building that stands out amidst apartments and flex-tech office buildings. The new structure totals 8,798 square feet of retail space, with 6,025 square feet leased to Oregon based Hopworks Urban Brewery. The exterior of the building is a mixture of board-formed concrete panels and corrugated steel siding, while the northern end of the building features a two story, floor-to-ceiling glass wall. A [...]

Project Completion: Parkside Shops 2018-05-20T14:09:36+00:00
10 Jan 2017

Project Completion: Koch Corporate Center, Buildings 1, 5 & 8

2018-05-20T14:09:36+00:00

The Koch Corporate Center is located in Tualatin, Oregon. The three buildings were designed for tenants with distribution or warehouse needs and includes build-to-suit office space. Building 1 is the largest building in the Corporate Center totaling 201,300 square feet. Building 5 is 60,000 square feet and Building 8 is 44,875 square feet. The project broke ground in January 2016 and was completed in October. Sierra is also the general contractor for the buildings 10, 11 and 12 of the Koch [...]

Project Completion: Koch Corporate Center, Buildings 1, 5 & 8 2018-05-20T14:09:36+00:00
9 Jan 2017

New Project: Bothell Apartments

2018-05-20T14:09:36+00:00

Sierra Construction broke ground on Bothell Apartments this month. Just blocks away from the historic downtown Bothell, this six-story 135 unit apartment project is modern, sophisticated and comfortable. The residential units range from open one bedrooms to two bedrooms, with private patios available. The project also has a secured parking garage with 137 parking stalls. Amenities will include multiple community patios, a media room and lounge, a roof deck with outdoor fire place and lounge areas, fitness center and clubroom. The project is anticipated [...]

New Project: Bothell Apartments 2018-05-20T14:09:36+00:00
21 Dec 2016

Building 2 at White River Corporate Center Receives LEED Certification

2016-12-20T15:42:39+00:00

Sierra Construction recently completed Building 2 of the DCT Industrial’s White River Corporate Center in Sumner, WA. With Gaia Development as the project’s LEED consultant and working closely with Carlile Coatsworth Architects, Building 2 received Core and Shell LEED Silver Certification earlier this week. The 251,437 square foot Building 2 has a 32’ clear height and offers 200’ truck courts with a 60’ concrete truck apron. A 7” warehouse slab and an average column spacing of 52’ x 50’ and [...]

Building 2 at White River Corporate Center Receives LEED Certification 2016-12-20T15:42:39+00:00
20 Dec 2016

Have you checked out Sierra’s interactive Complete Project History Map?

2018-05-20T14:09:36+00:00

Ever wondered if you are near a #sierrabuilt project? This map has markers for all of Sierra's industrial, multi-family, retail, you-name-it projects all the way back to Sierra's first building in 1986. Be sure to check it out here!    

Have you checked out Sierra’s interactive Complete Project History Map? 2018-05-20T14:09:36+00:00
23 Nov 2016

Two Sierra projects tilted in November

2018-05-20T14:09:37+00:00

Sierra Construction Company recently tilted walls on two projects in November.   Redmond Ridge #108, Redmond The first building, tilted early November, is known as Building #108 in Redmond Ridge’s business park. Due for completion in early 2017, the 44,782 square foot concrete tilt-up structure is owned by Portland based developer PacTrust. Situated on a total of 108 acres, the Redmond Ridge Corporate Center is a part of the mixed-use master-planned Redmond Ridge Community. Sierra has completed multiple [...]

Two Sierra projects tilted in November 2018-05-20T14:09:37+00:00
12 Oct 2016

New Project: LogistiCenter at I-5

2016-10-12T08:44:51+00:00

Work has begun for Dermody Properties' LogistiCenter at I-5. The finished project will be a 210,700-square-foot industrial facility on a 13 acre site near the intersection of I-5 and SR 512 in Lakewood, Washington.

New Project: LogistiCenter at I-5 2016-10-12T08:44:51+00:00
4 Oct 2016

New Project: Linden Flats

2018-05-20T14:09:37+00:00

GMD plans 170 affordable units for site on Linden, near Aurora By BRIAN MILLER GMD Development and architect BCRA have gone through the second design review meeting for Linden Flats, a six-story complex with 170 affordable units at 13280 Linden Ave. N. Linden Flats will be “100 percent affordable,” said GMD's Rebecca Ralston. Rents will be at or below 60 percent of area median income. The project team plans to use the city's multifamily tax exemption (MFTE) program and low-income [...]

New Project: Linden Flats 2018-05-20T14:09:37+00:00
30 Sep 2016

New Project: Stadium Apartments

2018-05-20T14:09:37+00:00

Breaking ground in August 2016, the 220,000 square foot mixed-use Stadium Apartment building will be located in the Stadium District of Tacoma. The project will have 172 residences varying from studio, one and two bedroom units. The project will also have 2,260 square feet of retail space and offer 204 parking spaces. This project is due for completion by August 2018.

New Project: Stadium Apartments 2018-05-20T14:09:37+00:00
6 Sep 2016

Project Completion: Uptown 11

2018-05-20T14:09:37+00:00

Completed in August, this Queen Anne mixed use project is a three story, 42,700 square foot building with ground retail and upper floor residential units. The two and a half level underground parking garage has 65 parking stalls. The 34 residential units range from studio to two bedroom spaces, span the top two floors, and some offer a private balcony. Units feature bamboo vinyl flooring, quartz countertops, stainless appliances and 9' ceilings.  Uptown 11 also has a 9,500 square foot green roof [...]

Project Completion: Uptown 11 2018-05-20T14:09:37+00:00
15 Aug 2016

Nation’s largest used car dealer starts work

2016-10-03T15:33:29+00:00

LYNNWOOD — Construction is under way on a CarMax dealership along Highway 99. The publicly traded company bills itself as the nation’s largest used auto dealership. It’s big enough to rank on the Fortune 500 list of wealthiest U.S. companies. Work started last month on the 9-acre site of the former Detroit Autoworks property along Highway 99 at 212th Street SW. The project is expected to be finished in March. Sierra Construction of Woodinville is the general contactor. Plans call [...]

Nation’s largest used car dealer starts work 2016-10-03T15:33:29+00:00
10 Aug 2016

Highline Place – Phase 1 Groundbreaking

2018-05-20T14:09:37+00:00

Monday held the ceremonial groundbreaking for Highline Place - Phase 1 in Des Moines, Washington. The finished project will feature 160-bed, state of the art student housing  units for Highline College, and over 12,000 square feet of ground floor retail space. Each unit will have kitchens and living areas, and residents will have access to a large rooftop community room and deck. Looking towards the future, the location will also provide easy access to the future light rail system. Highline College [...]

Highline Place – Phase 1 Groundbreaking 2018-05-20T14:09:37+00:00
29 Jul 2016

Tilt completed at DCT White River Corporate Center

2018-05-20T14:09:37+00:00

The final panel was tilted this morning for Building 2 at DCT White River Corporate Center in Sumner. Due for completion fall of this year, the 251,000 square foot distribution center is owned by DCT Industrial. 

Tilt completed at DCT White River Corporate Center 2018-05-20T14:09:37+00:00
29 Jul 2016

Project Completion: Dwell at Kent Station

2018-05-20T14:09:37+00:00

The City of Kent and Puget Sound-based developer Tarragon celebrated the completion of the Kent Station mixed-use, transit oriented development (TOD) last Thursday.   The final phase of the project included the construction of Dwell at Kent Station, a 154-unit, four story plus ground level parking apartment building. Units include a mix of studio, one bedroom, and two bedroom units, some including dens. As a Built Green project, Dwell at Kent Station offers a long list of amenities. Residents have [...]

Project Completion: Dwell at Kent Station 2018-05-20T14:09:37+00:00
8 Jul 2016

Walls go up at DiJulio Land

2018-05-20T14:09:37+00:00

Walls were tilted yesterday at the DiJulio Land Co. property in Everett. Due for completion this Fall, the project will be a 50,196 square foot warehouse for Lincoln Moving and Storage.

Walls go up at DiJulio Land 2018-05-20T14:09:37+00:00
6 Jul 2016

Hopworks to Open New Brewpub in Vancouver

2018-05-20T14:09:37+00:00

Because beer lovers, biker riders, and families live in Vancouver, Washington, too, the brewpub chain popular with all three demographics (especially beer-drinking, bicycling parents), Hopworks Urban Brewery is opening a location in the suburb over the state line. Brewmaster Christian Ettinger opened the original pub and brewery on SE Powell in 2007. This will be the company’s third location after it opened Bike Bar—more of a tied house than a brewpub—on N Williams in 2011. As we first reported in [...]

Hopworks to Open New Brewpub in Vancouver 2018-05-20T14:09:37+00:00
24 Jun 2016

Final Phases of Des Moines Business Park Underway

2016-06-23T15:30:15+00:00

  Phase 3 of Panattoni Development’s Des Moines Creek Business Park is well underway. Phase 3 includes the construction of two concrete tilt-up warehouse buildings totaling 502,194 square feet. Sierra Construction is the general contractor, and the project is due for completion Spring 2017. Phase 2’s 299,000 square foot, five story office building will be home to the Federal Aviation Administration’s new offices and is slated to open in 2018. Being developed by Panattoni and owned by the Port of [...]

Final Phases of Des Moines Business Park Underway 2016-06-23T15:30:15+00:00
22 Jun 2016

Project Completion: Puyallup West

2016-06-20T08:41:46+00:00

The Puyallup West Distribution Center is a 170,592 square foot warehouse on 10 acres located in Puyallup. Sitework for this project included widening of the Valley Avenue bridge and making traffic signal modifications at the intersection of Valley Ave and 27th Ave. Ct. NW. The project features 30’ clear height, 44 dock high and 4 at grade doors, ESFR fire sprinkler system, an electric storm pump lift station, and 120' truck courts with 60' deep concrete truck aprons. Puyallup West is an Avenue55/Cabot [...]

Project Completion: Puyallup West 2016-06-20T08:41:46+00:00
20 Jun 2016

Project Completion: PowderMill Business Center Phase 2

2016-06-20T08:23:01+00:00

The final phase of PowderMill Business Center at Seaway Center in Everett has been completed. Consisting of two buildings totaling 144,425 square feet (Building C at 82,825 square feet and Building D at 61,600 square feet), the 30' clear height Business Center offers flexible tenant spaces to accommodate a variety of tenant sizes. Phase 1 of this project included significant sitework for the 35 acre wooded, heavily sloped site, and required cut and fill of 200,000 cubic yards of material. Phase 1 [...]

Project Completion: PowderMill Business Center Phase 2 2016-06-20T08:23:01+00:00
10 Jun 2016

DCT White River Corporate Center Phase II North begins

2016-06-23T15:24:37+00:00

General Contractor Sierra Construction broke ground last week on DCT White River Corporate Center Phase II North. When completed, the 251,427 square foot ‘Chinook’ building will have a 32’ clear height and offer 200’ truck courts with a 60’ concrete truck apron.  Column spacing will generally be 52’ x 60’ which provides a wide range of tenant possibilities. Phase II is due for completion in early 2017. The neighboring 648,679 square foot ‘Coho’ building is 100% occupied and was completed [...]

DCT White River Corporate Center Phase II North begins 2016-06-23T15:24:37+00:00
4 May 2016

Project Completion: Franklin Business Park II

2016-05-04T15:35:08+00:00

The Franklin Business Park II is a 63,102 square foot multi-tenant industrial park located in Tualatin. With 14’ – 18’ clear height and various tenant configurations, the park offers a wide range of spaces for lease. Franklin Business Park II is locally owned and managed by Pacific Northwest Properties, and offers both dock and grade loading as well as a fire protection system. Completed in April 2016, only one 12,071 square foot space remains available in Franklin Business Park II.

Project Completion: Franklin Business Park II 2016-05-04T15:35:08+00:00
Load More Posts