 |
 |
 |
 |
 |
 |
 |
 |
 |
From the start, one of our staple products has been the construction of large tilt-up concrete industrial buildings. From Valley South Corporate Park, Van Doren’s Landing, the Kent Valley, and throughout the north west, we have successfully completed over 5,000,000 square feet of industrial space. |
 |
|
 |
 |
Michaels Distribution Center
Centralia, WA |
 |
 |
Tarragon Centralia
North 1, LLC |
 |
 |
| AHBL |
|
 |
 |
 |
 |
| This 718,577 square foot facility is located off of Hoss Rd. in Centralia, WA. We began construction in September of 2005. Upon completion of a 150,000 cubic yard mass excavation to establish building sub grade, we formed and poured nearly 28,000 cubic yards of concrete, utilizing on-site concrete batch plant capability. This included steel pin reinforced 8” and 10” slab on grade, 176 ea. 9-1/2” tilt up wall panels, 150,000 square feet of site concrete truck courts and bogey strips, with more than 26 miles of concrete slab sawn and construction joints. 6,834 cubic yards of concrete were placed during the month of February alone, including 3,770 cubic yards in one week of production. Docking involved 109 truck positions with cast in place dock pits, heavy duty dock levelers, dock truck restraints dock seals, and TKO dock doors which will serve the fully automated, 38 foot clear sort facility. The 5 million pound steel roof structure was designed to assume loads from the majority of the automated conveyance system. High efficiency T-5 fluorescent warehouse lighting, Early Suppression Fast Response (ESFR) fire protection system, fully integrated CCTV, burglar alarm, fire alarm and card access systems and approximately 32,000 square feet of mezzanine storage compliment the state of the art distribution facility. Sierra will remain on-site through January of 2007 to support racking and conveyance system installations. |
|
|
 |
 |
 |
 |
| Algona Distribution Center, Bldg. C |
Algona, WA |
| Auburn West, No. 3 |
Auburn, WA |
| American Millwork |
Monroe, WA |
| BP 20 |
Redmond, WA |
| BP 18-19 |
Redmond, WA |
| BP 16-17 |
Redmond, WA |
Bev-Ed Corporate Park – Buildings A,B,C,D |
Everett, WA |
| Boeckman Corporate Center |
Wilsonville, OR |
| Fife Corporate Center |
Fife, WA |
| Federal Express |
Bellingham, WA |
| FedEx Expansion |
Auburn, WA |
| FedEx Hub Expansion |
Portland, OR |
| Galco Building, Phase 1 & 2 |
Everett, WA |
| Galco Development Warehouse |
Everett, WA |
| Georgia Pacific Tissue Warehouse |
Bellingham, WA |
| Harbor Pacific Bottling |
Elma, WA |
| Imagicorp Building |
Redmond, WA |
| Industrial Rubber |
Fife, WA |
| K & N Meats Cold Storage Facility |
|
|
| Mackie Designs |
Woodinville, WA |
| Mackie Designs II |
Woodinville, WA |
| Mason Industrial Park |
Portland, OR |
| Milgard Manufacturing |
Fife, WA |
| Nissan Motor Corporation |
Kent, WA |
| Paragon Industries Building |
Kent, WA |
| Seattle Times Rotary Offset Press Building |
Kent, WA |
| Sunrise Business Park |
Clackamas, OR |
| Tualatin Valley Waste Recovery |
Hillsboro, WA |
| Valley South Corporate Park, Carbon Building |
Sumner, WA |
| Valley South Corporate Park, Sunrise Building |
Sumner, WA |
| Valley South Corporate Park, Pyramid Building |
Sumner, WA |
| Valley South Corporate Park, Mowich Building |
Sumner, WA |
| Valley South Corporate Park, Emmons Building |
Sumner, WA |
| Valley Supply |
Maltby, WA |
| Van Doren's Center |
Kent, WA |
| VN Graphics Building |
Redmond, WA |
| WCI Cable |
Hillsboro, OR |
|
 |
|
|