Monthly Archives: December 2018

NEWS

27 Dec 2018

Project Update: Glacier Peak Business Park

2019-01-03T14:47:40+00:00

December 27, 2018   Glacier Peak at Riverside Business Park tilted last week. The entire project includes 112 panels with 4 sheer panels. The completed building will be a 204,498 square foot distribution warehouse located along the Snohomish River in Everett with exposure to I-5. The Glacier Peak will have a 30′ clear height, 130′ concrete truck apron, 38 dock high doors, and 4 drive-in doors. Sierra Construction broke ground on the 9.6 acre site in Everett, Washington in May. https://youtu.be/rfBRCWevP-E [...]

Project Update: Glacier Peak Business Park 2019-01-03T14:47:40+00:00
20 Dec 2018

Project Update: First Glacier Logistics

2018-12-21T11:13:31+00:00

December 20, 2018   First Glacier Logistics building was tilted last week in Sumner, WA. Work began on First Glacier Logistics in October 2018. Built with a total of 55 tilt panels, limited slab space resulted in two separate tilts to successfully close the building exterior.  This new distribution facility will be a total of 66,000 square feet, with a 30’ clear height. First Glacier will also feature 18 exterior dock doors, 2 drive-in doors, and over 60 parking spaces. [...]

Project Update: First Glacier Logistics 2018-12-21T11:13:31+00:00