Project Update: Portside 55

2018-09-18T07:28:10+00:00

Portside 55 North in Tacoma recently tilted the second building. This phase of the Portside 55 development consists of two buildings; Building A and Building B. Building A is a 155,000 square foot building designed for future rail access. The building was tilted using 82 wall panels and 11 ramp panels, the heaviest weighting 113,300lbs. The smaller of the two, Building B, was constructed using 48 building panels and 8 ramp panels, the heaviest weighing 87,200lbs. The North phase of [...]

Project Update: Portside 55 2018-09-18T07:28:10+00:00
22 Aug 2018

Project Update: West Woodland Business Center

2018-08-22T13:32:15+00:00

Ballard's West Woodland Business Center is taking shape. The project team has completed concrete pours on each floor and has begun framing on the 4th floor. In the coming weeks steel erection will wrap-up, slab-on-deck concrete pours will conclude and framing will commence on the lower levels. The 72,000 square foot four story mixed-use commercial building broke ground earlier this year. The building will have a central freight elevator to accommodate light industrial tenants on all floors. An area where [...]

Project Update: West Woodland Business Center 2018-08-22T13:32:15+00:00
8 Aug 2018

Project Completion: Interbay Self Storage

2018-08-01T14:11:33+00:00

Interbay is a four story self-storage in the Interbay district of Seattle. The 94,000 square foot building was constructed using a hybrid method that utilized both concrete tilt-up and structural steel. It’s smaller in footprint and value compared to some of Sierra’s other projects but has a complex design and was a challenging to build. Due to the small overall area of the slab, the project team could not cast all off the exterior panels at once and had to [...]

Project Completion: Interbay Self Storage 2018-08-01T14:11:33+00:00
7 Aug 2018

New Project: Hogum Bay Logistics Center, Buildings 4 & 5

2018-08-07T09:31:10+00:00

Located in Lacey, Washington, the Hogum Bay Logistics Center is a new construction state-of-the-art industrial development. In total, this development contains three buildings totaling 1.1 million square feet. This phase of the project includes the construction of Buildings 4 (144,000 square feet) and Building 5 (155,000 square feet). Both buildings will have a 32’ clear height and 130’ truck courts. This project is due for completion Q1 2019.

New Project: Hogum Bay Logistics Center, Buildings 4 & 5 2018-08-07T09:31:10+00:00
1 Aug 2018

Project Completion: Stadium Apartments

2018-08-01T10:25:30+00:00

Breaking ground in August 2016, Stadium Apartments is a 220,000 square foot mixed-use building located in the Stadium District of Tacoma. The building has 172 residences varying from studio, 1 and 2 bedroom units. Stadium is 10 stories total; 7 above grade, and 3 below-grade parking levels. Some units also feature high ceilings, patios and balconies, floor-to-ceiling windows and walk-in closets. A unique feature to Stadium is the outdoor covered community room on the 7th floor with expansive Puget Sound [...]