Yearly Archives: 2017

NEWS

17 Apr 2017

Project Update: Prologis Park Tacoma

2017-04-14T11:28:15+00:00

Work began on an 80 acre undeveloped site near Port of Tacoma in December. Known as Prologis Park Tacoma, the site is a planned 1.3+ million square feet of new industrial development. Sierra Construction is the general contractor for Building B, which will stand at 770,195 square feet with a 36’ clear height. The building boasts 174 dock doors with a triple-loaded dock configuration. The project is scheduled for turnover later this year. 

Project Update: Prologis Park Tacoma 2017-04-14T11:28:15+00:00
3 Mar 2017

New Project: Big Eddy Commerce Center

2017-03-03T11:05:31+00:00

Sitework began last year on this 135,387 square foot tilt-up commerce center on 7.5 acres in Gresham, Oregon.  'Big Eddy' will have a 30' clear height, 30 dock doors and 5 grade level doors with a 6" slab. The office will be build-to-suit. Located within in the Airport Way submarket the project is a part of a 230-acre master-planned business park development.

New Project: Big Eddy Commerce Center 2017-03-03T11:05:31+00:00
2 Mar 2017

New Project: Bothell 185 Apartments

2018-05-20T14:09:36+00:00

Puget Sound based real estate developer, Tarragon, broke ground this month on a 135-unit residential project in Bothell, WA. The six level apartment building will include five wood-framed stories of residential apartments over one story of secured parking, which includes 137 parking stalls. The unit mix will include a variety of unit types.Unit finishes and amenities will be modern with solid-surface counters, stainless steel appliances, hard-surface floors, and open layouts with an abundance of natural light. Some units will have [...]

New Project: Bothell 185 Apartments 2018-05-20T14:09:36+00:00
27 Feb 2017

Project Completion: WRCC Chinook

2018-05-20T14:09:36+00:00

Sierra received final Certification of Occupation this month for the DCT's White River Corporate Center Phase II North, also known as the 'Chinook' building. The 251,437 square foot Chinook has a 32’ clear height and offers 200’ truck courts with a 60’ concrete truck apron. A 7” warehouse slab and an average column spacing of 52’ x 50’ and 52’ x 60’ creates a wide range of tenant possibilities. Upon completion of the building shell, a 3,055 square foot speculative office build-out was [...]

Project Completion: WRCC Chinook 2018-05-20T14:09:36+00:00
20 Jan 2017

Tower Crane Raised at Linden Flats

2018-05-20T14:09:36+00:00

Thursday was a busy day for the Linden Flats jobsite in Seattle, and the weather provided a clear day for passer-bys to watch the action. Team members installed privacy screen along Linden Avenue and at the site corner near Wells Fargo, adorned with renderings of the final project as well as logos of the project team. Coast Crane installed a Potain crane that will aid in constructing the six story, multi-family building by supplying materials to various floors as the [...]

Tower Crane Raised at Linden Flats 2018-05-20T14:09:36+00:00
12 Jan 2017

Project Completion: Parkside Shops

2018-05-20T14:09:36+00:00

Located in the heart of PacTrust’s Columbia Tech Center development in Vancouver Washington, recently completed Parkside Shops is a unique building that stands out amidst apartments and flex-tech office buildings. The new structure totals 8,798 square feet of retail space, with 6,025 square feet leased to Oregon based Hopworks Urban Brewery. The exterior of the building is a mixture of board-formed concrete panels and corrugated steel siding, while the northern end of the building features a two story, floor-to-ceiling glass wall. A [...]

Project Completion: Parkside Shops 2018-05-20T14:09:36+00:00
10 Jan 2017

Project Completion: Koch Corporate Center, Buildings 1, 5 & 8

2018-05-20T14:09:36+00:00

The Koch Corporate Center is located in Tualatin, Oregon. The three buildings were designed for tenants with distribution or warehouse needs and includes build-to-suit office space. Building 1 is the largest building in the Corporate Center totaling 201,300 square feet. Building 5 is 60,000 square feet and Building 8 is 44,875 square feet. The project broke ground in January 2016 and was completed in October. Sierra is also the general contractor for the buildings 10, 11 and 12 of the Koch [...]

Project Completion: Koch Corporate Center, Buildings 1, 5 & 8 2018-05-20T14:09:36+00:00
9 Jan 2017

New Project: Bothell Apartments

2018-05-20T14:09:36+00:00

Sierra Construction broke ground on Bothell Apartments this month. Just blocks away from the historic downtown Bothell, this six-story 135 unit apartment project is modern, sophisticated and comfortable. The residential units range from open one bedrooms to two bedrooms, with private patios available. The project also has a secured parking garage with 137 parking stalls. Amenities will include multiple community patios, a media room and lounge, a roof deck with outdoor fire place and lounge areas, fitness center and clubroom. The project is anticipated [...]

New Project: Bothell Apartments 2018-05-20T14:09:36+00:00
Load More Posts